Since the nineties, the OWC (Oscillating Water Column) plants were developed at full scale to produce electrical power from ocean waves [1]. A prototype was built into a caisson breakwater of the Sakata Port, in Japan; other plants were built in India, in Scotland at Islay, in Portugal at the Azores. A new plant was built in Mutriku (Spain) recently. A new kind of OWC caisson, named U-OWC or REWEC3, was proposed by Boccotti [2]. With respect to a traditional OWC, a U-OWC plant includes an additional vertical duct, which enables to tune the eigenperiod of the plant to the peak period of the wave pressures acting on the converter-breakwater. In this way, resonance conditions can be reached without phase control devices and the wave pressures into the air pocket are increased in amplitude, amplifying the performance of the plant. In 2012, a full scale U-OWC (REWEC3) breakwater has been designed in Italy, for the harbour of Civitavecchia (the port of Rome - Port Authority of Civitavecchia). Such a breakwater embodies 19 caissons, each including 8 cells, 34m long. The paper disseminates the key issues pertaining the design stage. Further, it describes the main phases of the construction stage. The building of the caisson started in October 2012. The first caisson has been completed at the end of 2012. It is the first device for wave energy in the Mediterranean Sea and one of the biggest in the world.

On Design and Building of a U-OWC Wave Energy Converter in the Mediterranean Sea: A Case Study

ARENA F;ROMOLO A;MALARA G;
2013-01-01

Abstract

Since the nineties, the OWC (Oscillating Water Column) plants were developed at full scale to produce electrical power from ocean waves [1]. A prototype was built into a caisson breakwater of the Sakata Port, in Japan; other plants were built in India, in Scotland at Islay, in Portugal at the Azores. A new plant was built in Mutriku (Spain) recently. A new kind of OWC caisson, named U-OWC or REWEC3, was proposed by Boccotti [2]. With respect to a traditional OWC, a U-OWC plant includes an additional vertical duct, which enables to tune the eigenperiod of the plant to the peak period of the wave pressures acting on the converter-breakwater. In this way, resonance conditions can be reached without phase control devices and the wave pressures into the air pocket are increased in amplitude, amplifying the performance of the plant. In 2012, a full scale U-OWC (REWEC3) breakwater has been designed in Italy, for the harbour of Civitavecchia (the port of Rome - Port Authority of Civitavecchia). Such a breakwater embodies 19 caissons, each including 8 cells, 34m long. The paper disseminates the key issues pertaining the design stage. Further, it describes the main phases of the construction stage. The building of the caisson started in October 2012. The first caisson has been completed at the end of 2012. It is the first device for wave energy in the Mediterranean Sea and one of the biggest in the world.
2013
978-0-7918-5542-3
U-OWC
REWEC3
Civitavecchia
File in questo prodotto:
File Dimensione Formato  
OMAE2013-11593.pdf

solo utenti autorizzati

Tipologia: Versione Editoriale (PDF)
Licenza: Tutti i diritti riservati (All rights reserved)
Dimensione 660.77 kB
Formato Adobe PDF
660.77 kB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12318/14852
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 100
  • ???jsp.display-item.citation.isi??? 19
social impact